Manufacturing

Eight departments. One continuous line.

Warping, covering, rubber warping, production, finishing, checking, packing, and dispatch. Every meter follows this path before it leaves Sonipat.

2.5M m

Daily capacity

Elastics, tapes & webbings

300

Production machines

Woven, knit, crochet, braid

20+

Checking machines

AI + manual inspection

2M m

Checking capacity / day

Before packing release

Process flow

How a meter is actually made here

This is the real sequence on our floor: yarn beams and covered rubber beams are prepared first, then constructions are woven, knitted, crocheted, or braided, heat-set on hot rollers, checked, packed to preference, and dispatched.

Warping

Stage 01 / 08

Yarn beams prepared

01

Warping

Yarns are warped onto beams under controlled tension, so every end that reaches the loom is even, aligned, and ready for production.

  • Multi-end yarn creels feeding the warper
  • Even tension across the full beam width
  • Beams sized for elastic, tape, and webbing constructions

Next → Covering

Covering

Stage 02 / 08

Yarn-covered rubber bobbins

02

Covering

Rubber or spandex cores are wrapped with polyester, nylon, or cotton on covering machines. These covered bobbins feed the rubber warping stage and give the core strength, controlled stretch, and heat resistance.

  • Single or double cover (S / Z twist)
  • Rubber and spandex cores
  • Bobbins prepared specifically for rubber warping

Next → Rubber Warping

Rubber Warping

Stage 03 / 08

Covered rubber beams

03

Rubber Warping

Covered rubber bobbins are warped into beams with matched elongation and density. These elastic beams sit alongside yarn beams on the production machines.

  • Covered rubber beams built from covering bobbins
  • Extension fine-tuned for the construction
  • Uniform density for stable loom feeding

Next → Production

Production

Stage 04 / 08

Elastics, tapes & webbings

04

Production

Elastics, tapes, and webbings are made on their specific machines based on the construction: woven, knitted, crochet, or braided. Machine type follows the product, not the other way around.

  • Needle looms for woven elastics and webbings
  • Knitting and crochet for soft-touch constructions
  • Braiding for cords and round elastics

Next → Finishing

Finishing

Stage 05 / 08

Hot rollers remove shrinkage

05

Finishing

Finished elastic is run over hot rollers to heat-set the tape and remove shrinkage. This prevents curling in the garments and products where the elastic is later used.

  • Hot-roller heat setting
  • Shrinkage removed before packing
  • Curl control for apparel and technical uses

Next → Checking

Checking

Stage 06 / 08

AI + manual inspection

06

Checking

AI checking and manual inspection run across more than 20 machines, with checking capacity over 2.5 million meters daily. Width, defects, and meterage are cleared before packing.

  • 20+ checking machines
  • Over 2.5 million meters daily capacity
  • AI checking being integrated alongside manual QC

Next → Packing

Packing

Stage 07 / 08

Client-preferred formats

07

Packing

Checked material is packed to client preference: continuous rolls, cut pieces, layered packs, or retail formats such as hanks and spools.

  • Rolls
  • Cut pieces
  • Layered packs
  • Hanks & spools

Next → Dispatch

Dispatch

Stage 08 / 08

Export-ready consignments

08

Dispatch

Cleared lots are palletised, documented, and dispatched. Final random audits from the quality system still apply. A fail holds the entire lot for recheck before anything leaves the dock.

  • Export cartons and pallets
  • Order-linked documentation
  • Lot release only after final clear

Packing options

Packed the way your line receives it

After checking, material is packed to client preference. One construction can leave as rolls for a cutting floor, pieces for an assembly cell, or retail hanks for a merchant.

Rolls

Continuous winding for garment and industrial lines that feed meters.

Cut pieces

Pre-cut lengths for assembly cells that need fixed piece counts.

Layered packs

Flat layered packing for orderly picking and clean carton density.

Hanks & spools

Retail-ready hank and spool formats for merchants and small-run buyers.

Why finishing matters

Hot rollers take the shrinkage out before your product sees it

Elastic that skips heat-setting can curl or shorten after sewing. Our finishing line runs the tape over hot rollers so residual shrinkage is removed in-house, not in your garment or strap.

Why checking is separate

2.5 million meters a day do not leave unchecked

Checking is its own department: AI assist plus manual inspection across 20+ machines. Only cleared meters move into packing. Dispatch still samples again, and a fail holds the full lot.

See the five quality gates

Plant visit

Walk the line from warping to dispatch